Paver Base & Sand: What Goes Under a Patio

By RugCalc Editorial Team · Last updated: 2026-06-11 · 7 min read

Quick answer: a paver patio needs 4–6 in of compacted gravel base plus 1 in of sand. The base carries the load — not the pavers. Here's how much to dig and what to add.

Skip the manual math? Use the free paver base & sand calculator — enter the patio size and depths, and it returns gravel and sand in yards and tons.
Laying pavers on a patio
In this guide
  • Why the base matters
  • Base depth
  • Sand bed
  • Base chart
  • Worked example
  • Common mistakes
measure diagram for paver-base-and-sand
Measure the area. 1) Measure the length. 2) Measure the height or width. 3) Multiply for the total paver area.

Why the base matters

The base, not the pavers, carries the load. A compacted gravel base spreads weight, drains water, and keeps the surface from sinking and shifting. Pavers on bare dirt will settle unevenly and create a wobbly, tripping patio no matter how well they're laid.

plan diagram for paver-base-and-sand
Plan the paver. 1) Map the area you are covering. 2) Note openings or obstacles. 3) Subtract them from the total.

Base depth

For a patio, use about 4–6 in of compacted gravel. For a driveway that carries vehicles, go to 8–12 in. The gravel is crushed stone (often 3/4-in minus) compacted in layers over firm, level soil. More traffic = deeper base.

chart diagram for paver-base-and-sand
Find your size. 1) Pick your room or size. 2) Read across to the amount. 3) Round up to what you buy.

Sand bed

On top of the gravel goes a 1-in bed of sand that the pavers sit on and level against. After the pavers are down, sweep fine joint sand into the gaps and compact — that sand locks the pavers together, stops shifting, and helps control weeds.

coverage diagram for paver-base-and-sand
Check coverage. 1) Note how much one unit covers. 2) Divide your area by it. 3) Multiply by coats or rows as needed.

Base chart

UseGravel baseSand bed
Light patio / walkway4 in1 in
Standard patio6 in1 in
Driveway (vehicles)8–12 in1 in

Compact in thin layers and check level as you go — a base that's off level shows up in every paver above it.

zones diagram for paver-base-and-sand
Work in parts. 1) Measure first. 2) Do the paver math. 3) Add waste, then round up.

Worked example

A 10×12 patio at 6 in of base + 1 in of sand:

The paver calculator counts pavers; order base material by these volumes with some margin.

Common mistakes

apply diagram for paver-base-and-sand
Put it down in rows. 1) Lay the first row or coat. 2) Keep spacing even. 3) Cut to fit and finish.

FAQ

How much base do I need under pavers?

For a patio, use about 4–6 inches of compacted gravel base plus 1 inch of sand. For a driveway that carries vehicles, go to 8–12 inches of gravel. The base, not the pavers, carries the load.

What is the paver base made of?

The base is compacted crushed stone or gravel (often 3/4-inch minus), laid over firm soil. On top goes a 1-inch bed of sand that the pavers sit on and level against.

Do I need sand between pavers?

Yes — sweep fine joint sand into the gaps between pavers and compact the patio. The sand locks the pavers together, stops shifting, and helps control weeds.

Can I lay pavers on dirt without a base?

No — pavers on bare dirt will sink and shift. Even light-use patios need a compacted gravel base to keep the surface level and stable over time.

Use the calculator. Get exact pavers for your patio with the paver calculator.