Sonotube Calculator — Concrete Volume for a Round Column

Published: October 14, 2026

Enter your tube diameter and height to get the concrete in cubic feet, cubic yards and bags. No sign-up, no data stored.

Quick answer: A 12-in tube, 4 ft tall, needs about 3.1 cu ft of concrete — about 6 bags of 80-lb mix.

Concrete needed

—

Cubic feet
—
Cubic yards
—
Bags (selected)
—
With spillage
—

How Sonotube volume is estimated

The math is a cylinder, but real pours always lose a bit to the ground and the mixing bucket. A 5% allowance keeps you from running short mid-pour; a second trip or a cold joint in a post footer is far worse than one spare bag.

Worked example: A 12-in tube, 4 ft tall: radius = 6 in = 0.5 ft, area = π x 0.5² = 0.785 sq ft. Volume = 0.785 x 4 = 3.14 cu ft. In 80-lb bags: 3.14 / 0.6 = 5.2, so 6 bags with spillage. Ready-mix: 3.14 / 27 = 0.12 cu yd.

Tube size → concrete per foot reference

Volume per foot of height, before spillage.

Tube diameterCu ft / ft80-lb bags / ft
8 in0.350.6
10 in0.550.9
12 in0.791.3
14 in1.071.8
16 in1.402.3
18 in1.773.0

Last updated: October 2026 · Bag yields assume standard mix ratios; high-strength mixes can vary slightly by brand.

Sonotube FAQ

Can I reuse a Sonotube?

Generally no - the cardboard tube is single-use. It gets stripped after the concrete cures, and the wax coating plus mud make reuse impractical. Budget one tube per column.

Do I need a footer below the tube?

Often yes - a wider concrete footer under the column spreads the load and resists frost heave. The tube math only covers the column itself; add the footer volume separately if your plan calls for one.

What if my column is above 4 ft?

Tall columns are fine, but brace the tube plumb before pouring and pour in lifts, vibrating between them. Over 4-5 ft, consider ready-mix for speed and to avoid hand-mixing 30 bags.

Can I pour 2 columns from one batch?

Yes - add the two volumes together and mix enough bags for both. Keep the batches consistent by using the same bag brand and water ratio, or the two columns will set at slightly different shades.

When do I strip the tube?

After the concrete cures enough to hold its own shape - typically 24-48 hours, depending on weather. Peel the cardboard away with a knife; leaving it on traps moisture against the column in cold climates.

Related calculators & guides

Concrete for Sonotube

Volume math, bag choices and pouring tips for round columns.

Read the guide →

Concrete Calculator

Volume for slabs and footers in the same project.

Use the calculator →

Fence Post Spacing Calculator

Where the posts and tubes go along a fence line.

Use the calculator →

Deck Calculator

Posts, joists and boards for the deck above.

Use the calculator →